Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.
| Patient Application |
|
|---|---|
| Application Site |
|
| Number of Leads |
|
| Shielded |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Non-Philips Healthcare Equipment |
|
|---|---|
| Use with Philips Healthcare Equipment |
|
| Product Category |
|
| Product Type |
|
| Single-Patient Use OR Multi-Patient Use |
|
| CE Certified |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Sterile OR Non-Sterile |
|
| Minimum Shelf Life |
|
| Use with Other Supplies |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Use with Non-Philips Healthcare Equipment |
|
|---|---|
| Use with Philips Healthcare Equipment |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Number of Leads |
|
| Shielded |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Non-Philips Healthcare Equipment |
|
|---|---|
| Use with Philips Healthcare Equipment |
|
| Product Category |
|
| Product Type |
|
| Single-Patient Use OR Multi-Patient Use |
|
| CE Certified |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Sterile OR Non-Sterile |
|
| Minimum Shelf Life |
|
| Use with Other Supplies |
|
You are about to visit a Philips global content page
Continue